#checking of recurring
03-Mar-95 21:28:39
Sb: #checking of recurring
Fm: Ken Hackbarth 76470,342
To: Okna Corp. Technician 71333,2161
I was hoping this would be addressed in 4.1b but looks like I'll have to wait
until the next release. If a recurring event is checked off on the day that it
occurs everything works fine (sort of – I'd rather that I were able to do a
shift-click on the next occurance and come back to this one like was possible
in the previous version). However, if I try to check off a recurring event the
day after it has occured, the effect is to check off all future occurances of
that event. Checking off a recurring event after, in advance of, or on the day
of the event should all have the same effect – to check only that event.
Thanks, Ken