#Beyond Dec. 31, 97
08-Mar-95 01:36:32
Sb: #Beyond Dec. 31, 97
Fm: Herbert R. Nestler 100136,1604
To: Okna Corp. Technician 71333,2161
I have been a loyal user and outspoken fan of DTS for which a while — and I
congratulate everyone on the 4.1 upgrade. But I have a small problem. I had
hoped with this upgrade we could schedule calendar events beyond December 31,
1997. I work with trade shows which occur annually or sometimes even every
second or third year. The dates and places of shows I would like to track are
often scheduled 7-10 years in advance and I sure would like to use my DTS
calendar to keep track of them.
We know from 4.1 (and from everything that comes out of Bill Gates' operation)
that software usually takes longer to develop than is estimated. Therefore I am
concerned about waiting until DTS 5.0 comes out to be able to to schedule
events a little farther into the future.
I wonder if a patch might be practical to give us the rest of the century to
work with now?
-Herb Nestler 07-Mar-95 at 14:13 CET (Germany)