#Want List
16-May-95 00:16:02
Sb: #110899-#Want List
Fm: MICHAEL MIJAL 76101,2307
To: RAD Moose @ NewTek, Inc. 76004,3350
Hi Chuck,
Here's another one.
In the next few weeks I am going to be putting a 2 hour long video together.
Not having sufficient hard drive space I plan to assemble it in chunks on the
Flyer, then edit it to tape a piece at a time. Currently when you click on
"play project", the system goes thru some busy work (for some indeterminate
peiod of time), then starts playing the project. This makes it awfully hard to
edit sections of Flyer material to tape. You just don't know (without a lot of
trial and error) how long it takes from the time you press play, until the
video actually starts.
The solution to this would be to have a (lets call it "PREP COMMAND").
It could be a button or a hot key where as when you press it, the system does
all its busy work (prepairing to play), then instead of playing, it goes into
pause at the instant where play would begin. At this point, it could be waiting
for a GPI trigger or just hitting the play button and "play would start
instantly".
I'm not sure what people are doing at the present time when faced with
this situation. But I don't believe it can be easy or accurate. If such a
function is deemed useful, I'm sure it would be easy for the programmers to
implement.
Thanks for your attention,
Mike Mijal Westland Video Systems