CompuServe Messages

#Delay In PVR Shipment

    22-Jun-95 14:25:15
Fm: Terry Miller 72400,3306
To: Thomas Flannery 73160,121
Thomas, The PVR is shipping now, I just ordered one. There is one problem though. If ordered with the daughter card (which is what I did) it will not fit into the tower. The CPU on the mother card is in the way. Cameron (Cyberimage) is working on a solution to this problem for me now. DesignLab is also confirmed this "fit" problem. Looks like DPS may have dropped the ball big time on this one. When I was building a robot, I had a catalog for pin and slot connectors. I wonder if there is way to maybe externalize the two cards with ribbon cables. Anyone have any thoughts on that? Terry