#memory management
03-Aug-95 07:44:05
Sb: #183200-#memory management
Fm: Anselmo 100646,3314
To: Brian Rudolph [Adesk] 71722,170
Hallo Brian!
It's amazing but the configuration I told you seams to run!!
But the problem allready exists.
OK.: I have to confirm the Viewpoint model "explodet human skull" to the shape
of a sphere without loosing 3 dimensional informations. In my "Imagine" program
I have a group function to be able to bring an operation to different grouped
objekts. I can not find an oberation like this in 3ds/4. So I think I have to
attach all 88 objects in one. In the moment I attached a lot of objects. Now I
have only 2 objects with 59782 Vertices and 117919 Faces together after using
IPAS "Optimize" and 2 Lights
Available: 112400 KB, Used: 108820 KB, Swap:0, Page:0
When I try to attach this two objekts I get a error message: Not enough RAM! I
have 196 MB in my Pentium 90. Do I make anything wrong, or do I Ieave 3ds/4
limits.
Do you know how to use IPAS Stretch to a grouped object that is not attached,
because I have to use the single objects later.
A lot of questions I know, but it is not so easy to work with 100000 faces
objects.
Grus Anselm!