CompuServe Messages

#low-cost rendering

    28-Nov-93 05:00:49
Fm: Don Landis 71673,3612
To: John Wilson 72674,2643
>>The file is 4000 frames, and they rendered at 20 minutes per frame on a 486/33. and your budget of $1000— On my network of 3 – 486-66's it would render for: 4000 * 20 = 80000 minutes 80000 / 2 = 40000 minutes (assuming DX-2 is twice as fast as 486-33) 40,000 /3 = 13334 minutes for the network of three machines 13334 / 60 /24 = 9.26 days of rendering Recording at 180 frames per hour: 4000 / 180 = 22.2 hours plus of continuous tape time. But I can't do more than a 1000 frames in one spot on the tape before tape degradation so I would have to lay down in four passes and then butt edit to a submaster for a quality master. Maybe an LVR is called for? Therefore 2 days of recording time. $1000/((9.26 +2) * 24)= $3.70 per hour. FOR $35,000 WORTH OF HARDWARE + OPERATOR + COST OF DOING BUSINESS. IS THIS A NEW DEFINITION FOR SLAVE RENDERING OR WHAT? John, I think this example shows you how the numbers stack up.