#Help needed on a project
Please help us by calling Jim or Dwane at 1-504-467-7171 or faxing an answer to
1-504-466-9085 so we can finish the following:
During a project using Studio 3D for a crane operation simulation, we
ran into the following problem that we have been unable to find an answer for
in the manual and in a series of learning tapes. There is a cable that's hooked
to the crane that lowers or raises the boom. It has about seven sections to it
and we are using the hierarchy link. What can we do to keep the cable in place
and shorten it as the boom moves up or down?