CompuServe Messages

How much?

    03-Jun-94 00:21:02
Sb: How much?
Fm: Christopher Martin 73561,615
To: All
I begin by admitting that is has been a really bad week and this may be the direct cause of my "poor me" attitude, but I am interested in how much any of you folks would be charging for one of my typical jobs. I am getting nothing but grief these days about the cost of my stuff. We all know that the reported version is usually only a fraction of the actual time spent, which includes creative experimentation and stuff that never makes it into the final version. So, here is an outline of the last job and maybe some of you would like to just throw out some ballpark guesses at a real going rate: Setting: An environmental remediation pilot project. Components: 24 major pieces of equipment – all to be realistically modeled, including duct and piping between components. Storyboard: 1. Fade out buildings / structures that hide components 2. Show – highlight 3 major treatment systems (solids, liquids, gases) 3. Label and identify flow path through the entire system which is broken down into 5 sequences a. solids – thru 3 of the components b. gases – thru 7 of the components c. 3 separate liquid systems – each thru a minimum of 6 components 4. Describe one specific component in detail: a soil rotary dryer a. two concentric cyclinders b. soil in the inner cyclinder which is feed from a hopper/conveyor c. heat applied from the outer cyclinder to the inner cyclinder d. inner cyclinder roatates and is at a slight incline so soil tumbles and moves down the length of the cyclinder e. evaporated contaminants from the soil contained in the inner cyclinder and carried out via nitrogen gas carrier. Process: Provide client initial storyboard Receive approval of model Provide 1st offline (VHS) Provide 2nd offline – to include changes requested by client (VHS) Provide final online – to include additional changes requested by client (Betacam SP) This part isn't important, but is what I provided: Total length on tape (including all fades=2sec, 5sec hold at the end of each segment, 5sec gap between segments to aid post-production guys) = 12 minutes Well, what do you think? I know it is tough to guess, but any guess would help me out. I'll give you some place to start, I will submit a bill which includes my time, machine charges, and tape that is just over $6,000. Am I wacko? Or what? Thanks