CompuServe Thread

How much?

7 messages in this thread
#105515From: Christopher MartinJun 3, 1994 12:21 AM
I begin by admitting that is has been a really bad week and this may be the direct cause of my "poor me" attitude, but I am interested in how much any of you folks would be charging for one of my typical jobs. I am getting nothing but grief these days about the cost of my stuff. We all know that the reported version is usually only a fraction of the actual time spent, which includes creative experimentation and stuff that never makes it into the final version. So, here is an outline of the last job and maybe some of you would like to just throw out some ballpark guesses at a real going rate: Setting: An environmental remediation pilot project. Components: 24 major pieces of equipment – all to be realistically modeled, including duct and piping between components. Storyboard: 1. Fade out buildings / structures that hide components 2. Show – highlight 3 major treatment systems (solids, liquids, gases) 3. Label and identify flow path through the entire system which is broken down into 5 sequences a. solids – thru 3 of the components b. gases – thru 7 of the components c. 3 separate liquid systems – each thru a minimum of 6 components 4. Describe one specific component in detail: a soil rotary dryer a. two concentric cyclinders b. soil in the inner cyclinder which is feed from a hopper/conveyor c. heat applied from the outer cyclinder to the inner cyclinder d. inner cyclinder roatates and is at a slight incline so soil tumbles and moves down the length of the cyclinder e. evaporated contaminants from the soil contained in the inner cyclinder and carried out via nitrogen gas carrier. Process: Provide client initial storyboard Receive approval of model Provide 1st offline (VHS) Provide 2nd offline – to include changes requested by client (VHS) Provide final online – to include additional changes requested by client (Betacam SP) This part isn't important, but is what I provided: Total length on tape (including all fades=2sec, 5sec hold at the end of each segment, 5sec gap between segments to aid post-production guys) = 12 minutes Well, what do you think? I know it is tough to guess, but any guess would help me out. I'll give you some place to start, I will submit a bill which includes my time, machine charges, and tape that is just over $6,000. Am I wacko? Or what? Thanks
#105778From: doug ritceyJun 4, 1994 5:33 PM
Chris, I can't help you much with your pricing, but I'm curious to know what (or where) PRC is – do you do a lot of environmental projects? How about landfills? I'm with an environmental consulting group that's been toying with 3ds, but we haven't had the time to make much progress with it. Doug.
#105874From: Christopher MartinJun 5, 1994 11:39 AM
Doug, PRC-EMI which is the group I am with consists of 800 environmental folks in 27 offices across the US and a few international. I am a SW Hydrologist that has moved into the video relm. PRC does alot of superfund clean up work and under certain circumstances provides demonstration videos on recent pilot programs. That is where I come in. Landfills, lots. Personally I am trained in the HELP model along with 2 other folks in my small office in Helena. Ocross the company, we have done alot of landfill design, review, and oversight. What specifically could I answer for you regarding dumps <g>?
#105899From: doug ritceyJun 5, 1994 4:50 PM
Whew – ok, you win, you're bigger than me (g). We have about 20 people doing wastewater treatment, municipal water supply, and contaminated sites work (Phase 1-3 assessments, drilling, soils & ground water remediation). The contaminated sites part is my division. Oops – we do some landfill work also, and bioassays, toxicity etc – essentially a team of consulting scientists with environemntal experience (biology, geology, process engineering, chemistry). But we're run off our feet – having someone dedicated to 3DS (or even just 1 guy dedicated to "general" computer modelling) – what a dream! This is something I tackle on weekends and after midnight (i.e., at the end of the office day…). Doug.
#105956From: Christopher MartinJun 6, 1994 12:05 AM
What are you planning on doing with 3DS? Maybe I can offer some (probably very little) assistance. Chris
#106164From: doug ritceyJun 6, 1994 6:58 PM
Primarily apply it to our projects – short, VHS grade videos of proposed projects, treatment plants, 3d representations of contaminant plumes- so clients have a visual idea of where we're going with their money. Of course, this is still a pretty much open ended project. Presumably you're doing something similar?
#106180From: Christopher MartinJun 6, 1994 9:47 PM
Ah, now we're back to my original point…client education regarding the time required to develop a presentable project is extremely important if in fact you have a desire to be compensated reasonably for your efforts. Good luck. A gentleman responed to my orignal message with a little phrase which I thought was great and deserves repeating: Good, Fast, Cheap -> pick any TWO. Chris